Firestone Roof Replacement
World Cobble of Swansea, MA, needed a new roof, so they called Robert Evans Jr. Contracting. The existing roof had two layers, the top section being a batten bar EPDM roof over a tar and gravel roof. Both layers of the roof needed to be removed and new .040 EPDM Firestone fully adhered was to be installed over 3 inches of Poly ISO insulation.
After removal of the old roof, it was found that there was a pitch to the roof and that the drains that were installed over the years no longer needed. A new six-inch gutter was installed to replace the old scuppers.
When flashing the HVAC units, we use a twelve-inch tapered edge to keep water from standing around the units. The Firestone peel & stick pitch pocket and filler are used for the HVAC electric lines.
A new .040 bronze aluminum roof edging was installed around the perimeter to match the original edging and aluminum flashing, where the rubber was tied in with the main building.