Commercial Roof Installation
Boyle Bros. funeral home in Framingham discovered a leak and called us to look at it. It was on the flat section of there building a rubber was installed over a tar and gravel roof. A half inch fiber board was mechanically fastened over the tar and gravel, the problem with fiber board in a go over application is it acts like a sponge and sucks up water before showing any signs of a leak.
In Boyle Bros. case the roof had been leaking for years from a hole in the rubber and until the weight of this winters snow squeezed the water from the saturated fiber board.
We stripped off the roof and installed a new rubber roof with half inch recovery board instead of fiber board. With a warranty of ten years on our labor and fifteen years on materials we included an inspect of the roof in the fall
Residential Roof Installation
This large ranch in Framingham Ma. called on us to install a Lifetime CertainTeed Landmark Architectural shingles with a Granite Gray color.
Framingham Elks Roof Installation
The Framingham Elks needed a roof. Upon inspection of the existing roof there was a large amount of standing water it was determined that the roof was not pitched to the drains. A tapered insulation from Firestone was designed to pitch water to the drains. Not only was the roof not pitched right there was no insulation in the old roof. With the new tapered deck an average R-value of 22 was obtained bring the roof up to code. New .040 shop fabricated bronze aluminum was installed around roof edge.
Another design flaw was the HVAC duct work penetrated the roof through the shingle section was not flashed properly. We wrapped the duct work with insulation and white rubber to help with cooling in the summer.
The shingle section was stripped and shingled with GAF Timberline shingles which have a life time guarantee.
Residential Roof Replacement
This Framingham roof used CertainTeed 30 Landmark shingles nailed with 1 1/4 inch galvanized roof nails over six feet of ice and water barrier and 15 lb. tar paper.
Many roofers can install the roof adequately, but there is one part of the job that is very important that a lot of roofing contractors ignore: the clean up. After the bulk of the old shingles are removed and thrown in the dumpster, it is very important to run a magnet over the grounds to remove the loose nails, especially in the driveway. Most of the time the homeowners don’t even notice their roof, but they do know when their grounds are a mess or when somebody steps on a nail.
Conigliaro Industries Roof Installation
Conigliaro Industries of Framingham needed a new roof on there bailing room so they called in Robert Evans Jr Contracting Inc.
Conigliaro is a recycling company and since the bailing room is not heated the choice was made to recycle some old roof insulation. The one inch ISO was in good shape and because no R-value was need it worked out for all parties.
Five quarter pressure treated wood was installed around the perimeter and the insulation was mechanically fastened over the existing roof. Firestone .060 fully adhered EPDM roof was bonded to the ISO.
.040 aluminum roof edging was installed around the perimeter and cover tape was installed over it.
Residential Roof Replacement
New roof in Framingham Ma. Recently installed roof in the MetroWest area, the customer chose CertainTeed Landmark Charcoal 30 year shingles. Due to the fact that it is a ranch with a low pitched roof nine feet of ice and water barrier was used. Cobra ridge vent the chose for ridge ventilation.