UncategorizedRoof Abington

February 23, 2012by Robert Evans Jr Inc0

Recently completed roof and cedar siding job in Abington. With the non-existence of winter this year more people are doing their roofs and this roof could not wait.

The other problem with the house was there was a fire in the rear of the house. More damage was caused by the putting out the fire than fire it self. A new window had to be installed and new cedar siding was installed.

The roof was stripped and disposed of in our on site dumpster. New eight inch aluminum drip edge was installed on fascia and rakes. Six feet of ice and water barrier up was installed up from fascia and also installed in valleys. 15 lb roof felt was installed on the remainder. The home owner chose Certainteed Landmark Birchwood shingles. With a lifetime warranty this should be his last roof.

On the fire damaged section a new window had to be framed and installed. New plywood sheathing with Tyvek vapor barrier was used. Preprimed cedar clapboard was installed to match the existing

Leave a Reply

Your email address will not be published. Required fields are marked *